Errata
Whoops! Unfortunately, we can't claim that we never make mistakes which is why this page exists. Please find the errata for any misprints in the magazine below...
issue 1 | issue 2 | issue 4 | issue 5 | issue 6 | issue 7
issue 7.
wassilissa
The first section of The Fence section is missing instructions for Rounds 7 and 8
Rnd 7: *2 ch, 1 dc in same 2ch-sp, 1 dc, [1 V-st in next 1ch-sp] to 2 sts before 2ch-sp, sk 1 st, 1 dc, 1 dc in 2ch-sp; rep from * to end— 256 sts.
Rnd 8: *2 ch, 1 dc in same 2ch-sp, sk 1 st, 1 dc, [1 V-st in next 1ch-sp] to 3 sts before 2ch-sp, sk 2 sts, 1 dc, 1 dc in 2ch-sp; rep from * to end— 256 sts.
issue 6.
edifice
The base seaming instructions are missing. Just after adding the trim:
Sew or crochet the base of the bag closed, using your choice of invisible or visible seam. Sample has a surface crochet join in C2, worked through back loops of corresponding stitches from front and back.
issue 5.
oorlich dawn
Row 3 of the Sleeve section is just missing a single word:
Row 3 FP: With MC, 1 tss, tssinc, tss to marker, following colour patt in Chart B, 18 tss, with MC, tss to last 2 sts, tssinc, 1 tes— 2 sts increased.
la résilience
To adjust the circumference of the cowl, add or subtract foundation chains in multiples of 20.
issue 4.
tian-tian
The stated ease on the model is incorrect. The model is not wearing Tian-tian with no ease. The model is wearing size 2 with 6.5cm / 2.5" of positive ease.
Please note this jumper is written with designed negative ease, but if you prefer a looser fit, size up for positive ease instead.
issue 2.
aiteall
One part of the instructions in Rnd 1 (p.106) has too many size repeats. Round 1 should read:
Rnd 1: (RS) 3 ch (counts as 1 tr throughout), 3 tr, 1 ch, [4 tr, 1 ch] 10 (11, 12, 13, 14)(15, 16, 17, 18, 20) times, pm in 1ch-sp just made (Right Back),
[4 tr,1 ch] 6 (6,6,6,6)(6,6,6,6,5) times, pm in 1ch-sp just made (Right Front),
wind rose
Column B, Square 2 should read:
In the next rnd, you will join to prev column Square 2 and then to prev Square.
marée basse
Yoke Sizes 3-6 only and Yoke Sizes 7-10 only Round 5 should read:
Rnd 5: 2 ch, [10 MC2, 2 MC2 in next st] to end, join— 180 Mtr; 12 Mtr each rep.
issue 1.
spraoi mittens
The stitch count for Round 50 should read:
kishie
The stitch count for Size 3 is incorrect in the Hem Ribbing of the Back panel. The second paragraph of instructions under All Sizes should read:
Next row (selvedge dec): 1 ch and pull taut, dc in unworked loop of prev dc row to end, join with a slst2tog in BLO of Rows 1 and 2 of next 2 selvedge sts and pull taut, turn— 28 (29, 31, 32, 34)(34, 34, 34, 34, 34) sts.
laminaria.
The correct amount of yarn needed is:
MC: 285 (315, 360, 390, 435)(465, 510, 555, 600, 630)m / 315 (345, 390, 420, 480)(510, 555, 600, 660, 690)yd
CC1 and CC2: 180 (195, 225, 240, 270)(285, 315, 345, 360, 390)m / 195 (210, 240, 255, 300)(315, 345, 375, 390, 420)yd
cumulo
This pattern is only written in 9 sizes, and not the usual 10 sizes.